TURKEY: Test running has started with 14 CAF light rail vehicles for the 11 km Antalya tramway being built by Alarko, which is due for completion on June 14.
The line will have 16 stops, including two cut-and-cover stations, and a depot at the northern terminus of Fatih. From Fatih, the line heads south to Ismetpasa, where it connects with the existing tram line on the double-track section at Kalekapisi, before heading east to terminate at Meydan.