UK: WH Davis has supplied DB Schenker Rail with 12 hopper wagons to a new design which will enable aggregates to be delivered for Tarmac to terminals where unloading space is limited.
The 75 tonne capacity stainless steel bodies are higher above rail level than is normal for hoppers designed to discharge between the rails, enabling the load to be discharged onto a mobile conveyor inserted under the doors. T25 bogies were supplied by Axiom Rail.