By Railway Gazette International2023-02-03T11:00:00
TANZANIA: Tanzania-Zambia Railway Authority has taken delivery of a 200 tonne capacity well wagon which will be used to transport abnormal loads such as turbines for the construction of the Julius Nyerere hydroelectric power plant.
Already have an account? LOG IN
You’ve reached your limit of content for the month