UK: As part of the East London Line Extension project (RG 2.07 p89), the UK's largest mobile crane placed a 350 tonne bow-string bridge in place across Shoreditch High Street on March 29.
The 35 m long and 11 m high bridge was assembled on site from components produced by Fairfield Mabey in Chepstow.