By Railway Gazette International2001-03-01T11:00:00
Saltwood tunnel in Kent lies just 15m below a cutting for the Channel Tunnel Rail Link now under construction. To ensure that rail traffic can continue during construction, Rail Link Engineering has installed monitoring equipment in the brick-lined tunnel.
Site powered by Webvision Cloud