Pajares base tunnel contract

GIF has awarded Ineco and Geoconsult a €5·18m contract to design a 50 km high speed line running between La Robla and Pola de Lena on the Madrid - Oviedo main line. The new alignment includes a 25 km twin-bore base tunnel under the Pajares pass that is intended to ...

Subscriber content only.

Become a subscriber and unlock unlimited digital access

Subscribe now