Argentina railway news – Page 3
-
News
CRRC to supply 200 Roca EMU cars
ARGENTINA: Transport Minister Guillermo Dietrich has given his approval for an order to be placed directly with CRRC Qingdao Sifang of China for the supply of 200 EMU cars for the Roca commuter network in Buenos Aires, with an estimated cost of US$316∙5m. Joining a fleet of 42 EMUs previously ...
-
News
Transmashholding invests in Argentina
ARGENTINA: Transmashholding of Russia is to spend US$3m to refurbish and reopen the Mechita rolling stock workshops in the province of Buenos Aires, under the terms of an agreement signed on December 20 by Franco Comparato, representing its local subsidiary TMH Argentina, and Trenes Argentinos Infraestructura President ...
-
News
Army studies dual gauge
ARGENTINA: Under an agreement signed with infrastructure manager Trenes Argentinos Infraestructura, army engineers are to undertake studies for providing 1 676 mm gauge on a 60 km section of the 1 435 mm gauge Urquiza network between Zárate and Pilar. This will include new junctions and the design of specialised ...
-
News
Roca electrified to La Plata
ARGENTINA: Electric services began operating between City Bell and La Plata on the Roca commuter network in Buenos Aires on October 18, marking completion of an electrification project undertaken as part of a US$250m upgrade of the 1 676 mm gauge commuter routes running south from the capital. With the ...
-
News
Rail connection to Vaca Muerta proposed
ARGENTINA: State-owned oil company YPF has presented the Ministry of Transport with a US$500m project to build a rail connection to the Vaca Muerta field in the province of Neuquén, requiring new construction and the upgrading of existing infrastructure over a total of 700 km. In addition to materials required ...
-
News
1 500 EMU cars for Buenos Aires
ARGENTINA: The federal government announced on September 26 the start of tendering for what it describes as the largest rolling stock order ever to be placed for the Buenos Aires commuter network, covering the supply of 1 500 EMU cars or 169 trainsets plus maintenance over 10 years in five ...
-
News
Mitre viaduct works underway
ARGENTINA: On September 5 President Mauricio Macri joined Horacio Rodríguez Larreta, head of the Bueno Aires city government, and Transport Minister Guillermo Dietrich to mark the start of work on a 3∙9 km elevated alignment for the Mitre commuter route. Running between Avenida Dorrego and Avenida Congreso, the new viaduct ...
-
News
IDB funds San Martín electrification
ARGENTINA: The Inter-American Development Bank announced on August 24 that it had approved a U$400m loan to fund electrification of the San Martín commuter route in Buenos Aires, running for 76∙3 km from the Retiro terminus to Pilar. As well as electrification at 25 kV AC, the programme will include ...
-
News
Alstom signs first main line signalling contract in Argentina
ARGENTINA: Alstom announced on August 22 that it had signed its first contract to supply main line signalling equipment in Argentina, a €10m deal to renew electro-mechanical interlockings at Marcos Paz, General Las Heras, Empalme Lobos and Lobos on the Sarmiento commuter route in Buenos Aires. As subcontractor to Constructora ...
-
News
Belgrano upgrade completes first 100 km
ARGENTINA: Transport Minister Guillermo Dietrich announced on July 26 the completion of the first 100 km of track renewals under the programme to upgrade the 1 000 mm gauge Belgrano network for freight traffic. Under the first phase of the programme, track renewals are being undertaken on 535 km. The ...
-
News
Belgrano Sur heads for Constitución
ARGENTINA: On July 6 the Ministry of Transport announced the start of work on a new elevated alignment for the 1 000 mm gauge Belgrano Sur commuter route in Buenos Aires. Running for 5∙6 km, it will enable Belgrano services to run into the Plaza Constitución terminus of the 1 ...
-
News
Belgrano upgrade enters third phase
ARGENTINA: Transport Minister Guillermo Dietrich has announced the start of tendering for the third phase of the programme to upgrade the 1 000 mm gauge Belgrano network. Bids are being invited to undertake track renewals on 558 km in the provinces of Tucumán, Salta and Jujuy, including route C8 from ...
-
News
Buenos Aires ATS funding agreed
ARGENTINA: Agreements to fund the purchase of Nippon Signal Automatic Train Stop equipment for the Buenos Aires commuter network were signed during a recent official visit to Japan by President Mauricio Macri. A US$49∙5m loan agreed by Japan Bank for International Co-operation, Deutsche Bank and the government of Argentina is ...
-
News
Work starts on San Martín viaduct
ARGENTINA: Transport Minister Guillermo Dietrich joined head of the city government Horacio Rodríguez Larreta on June 8 to mark the start of work on a new 5 km elevated alignment for the San Martín commuter route in Buenos Aires. Replacing a surface alignment between Palermo and La Paternal stations which ...
-
News
Buenos Aires suburban network gets Tetra radio
ARGENTINA: A Tetra digital radio network has been installed on the Sarmiento, Mitre, San Martín, Belgrano Sur and Roca lines of the suburban rail network serving Buenos Aires. Indra supplied the system under a US$214m contract awarded in 2014 by federal railway operating company SOFSE. It is being used ...
-
Metro Report International
Buenos Aires suburban network gets Tetra radio
ARGENTINA: A Tetra digital radio network has been installed on the Sarmiento, Mitre, San Martín, Belgrano Sur and Roca lines of the suburban rail network serving Buenos Aires. Indra supplied the system under a US$214m contract awarded in 2014 by federal railway operating company SOFSE. It is being used ...
-
News
CRCC to upgrade San Martín network
ARGENTINA: During the course of an official visit by President Mauricio Macri to Beijing, on May 17 the Ministry of Transport signed an agreement for China Railway Construction Corp to undertake a comprehensive upgrade of the San Martín network, costing US$2∙4bn and due to take 39 months to complete. Combining ...
-
News
Roca electrification reaches City Bell
ARGENTINA: Electric services began operating between Berazategui and City Bell on April 24, marking completion of the latest phase of the project to electrify the Roca commuter route between Buenos Aires and La Plata at 25 kV 50 Hz. According to the Ministry of Transport, work continues with the aim ...
-
Metro Report International
Buenos Aires Line B power supply renewal contract
ARGENTINA: Following an international tender, Alstom announced on April 20 that it had been awarded a €17m contract to renew the power supplies on Buenos Aires metro Line B. The 15-month project includes the design, assembly and commissioning of medium voltage ring cables and third rail power supplies, as well ...
-
News
Specialised containers for fertiliser exports
BOLIVIA: State-owned oil and petrochemicals company YPFB has ordered 250 wagons and 500 specialised containers which will be used to transport fertiliser on the country’s 1 000 mm gauge rail network. While the wagons are being manufactured locally in Santa Cruz, the containers are now being delivered by CIMC of ...
- Previous Page
- Page1
- Page2
- Page3
- Page4
- Next Page