IRAQ: The government is reported to be seeking an operator for two proposed underground metro lines in Baghdad.
Both lines would be 23 km long. Line 1 would have 25 stations and Line 2 would have 22, with one interchange station serving both lines.
The main maintenance depot would build be alongside Line 1, and there would also be a depot at the southern end of Line 2.